Project: Thái Bình thermal power plant
Location: My Loc, Thai Thuy, Thai Binh
Scope of work: Installation of steam turbine, generators, auxiliary equipment 600MW for power plant.
Duration: 18 month
Value of contract:
Project: Dong Phuong Petroleum Blending Plant
Location: Can Tho
Scope of work:
– Fabrication and Installation of 06 storage tank 500m3
– Fabrication and Installation of steel structure
– Equipment installation: 06 distillation columns, 06 condensate columns, 05 LPG storage tanks 20 ton and pumps
Duration: 12 months (2013)
Project: Nghi Sơn cement corporation – Hiep Phuoc Distribution Terminal.
Location: Hiep Phuđoc – Nha Be
Scope of work:
– Fabrication and installation of steel structure
– Fabrication and installation of 02 hoppers
– Equipment installation: vibrating screen, bucket elevator, air compressors and compressed air piping system
Duration: 3 months (2010)
Project: Vina Kraft Paper Company
Location: My Phuoc 3 Industrial Zone – Ben Cat – Binh Duong
Main contractor: Chien Thang Engineering
Scope of work:
– Installation of steel structure
– Equipment Installation: Boiler (130 ton/hr), steam drum, steam turbine, electrostatic precipitator, stacks
Installation of Piping system and Ducting system
Duration: 12 months (2010)